223 Dizengoff St.

Classification: National Outline Plan 38/1
Area: Old North district of Tel Aviv
Status: Completed and occupied

About The Project

The original building was built at the end of the 1950s. It has 3.5 floors with a commerce facade and a kiosk.

Further 3.5 floors and a basement floor were added as part of the execution of the project and the reinforcement of the building. This was achieved by suspending part of the building. Tenants were also given balconies, a bicycle room and an elevator, and all of the building’s systems were replaced.

Before
After

Documentation from the construction site